General plant and equipment daily pre-use check sheet
The 8 checks an operator makes before using a general plant and equipment each day, on one printable sheet that covers a week. Free to print and use, no account needed.

The checks on the sheet
Universal checks
- Fluid levels — oil, hydraulic, coolant, fuel
Check on level ground. Top up where safe.
- No leaks or visible structural damage
- All controls respond correctly
- Brakes and steering operate correctly
- Guards and safety devices in place and working
Covers E-stops, interlocks, isolation devices, ROPS/FOPS where fitted.
- Lights, cameras, mirrors, horn, reversing alarm, beacon
- Statutory inspection (LOLER / PUWER) is in date
Certificate on the machine and not expired.
- Cab / work area clean — no trip hazards, no loose tools
PUWER doesn’t itself require a daily check or a written record of one. HSE’s construction guidance does recommend daily checks for some plant, such as dumpers and MEWPs, and a written sheet is the easiest way to show the check was done and a defect was reported. A pre-use check is not the PUWER inspection or the LOLER thorough examination: those are separate, by a competent person, and recorded. What the law requires, with the sources.
These sheets are general guidance, not a substitute for the manufacturer’s instructions, your own risk assessment or a competent person’s inspection. Add anything the manufacturer or the hire company asks you to check.