Guides
Guides to construction plant checks and registers
Written for the people who have to show a machine is safe to use: plant and site managers, supervisors and operators. Free, no account needed.
Plant checks on site: what the law actually requires
The operator's pre-use check, the PUWER inspection and the LOLER thorough examination are three different things. What each one is, who does it, how often and what has to be recorded.
The plant pre-use check set
A printable weekly pre-use check sheet for each common type of construction plant. Free to print and use.
What a plant register should contain
The fields a construction plant and equipment register needs, why each one is there, and a free template in Excel and CSV. Plus where a spreadsheet stops being enough.
A sample plant register
A week of daily checks on one machine, with a stop-work defect and its clearance, as the free register shows it.