Free plant register for construction
The plant arrived.
Is anyone checking it?
Drop in the hire note or a certificate, confirm what it read and print a sticker. From then on, whoever operates the machine scans it each morning and does the real daily check on their phone. You get the register.
Add an item of plantFree. No sign-up needed. For the whole fleet, the LOLER and PUWER dates and a lasting audit trail, use PlanOps.
Free plant register
Add an item of plant
One machine, free. We read the paperwork and fill the form in; you check it and confirm. Then the sticker goes on the machine and the daily checks start.
Checking the plant register…
This is a free, time-limited register for single items of plant at a time. Daily checks run for a set number of days, and the register remains available for a while after that. The daily check is the pre-use check an operative does before starting work; it does not replace the statutory thorough examinations and inspections the plant needs, and the register does not track them.
A check that gets done. A record that shows it.
From hire note to register
Four steps.
Nothing to install.
The supervisor does the first two steps. The operative does the third every morning. The fourth is your register.
- 01
Add the plant from its paperwork.
Drop in the hire note, the LOLER report or the PUWER record. The description, serial number, fleet number and hire company are read off and put in the form for you to check. No paperwork to hand? Fill the form in by hand.
- 02
Put the sticker on the machine.
A QR sticker comes back straight away, ready to print or save. Put it in the cab or on the control panel. Scanning it opens the daily check for that machine and nothing else.
- 03
The operative checks it each morning.
The first time, they type their name; after that, their phone remembers it. Then they work through the pre-use checklist for that type of machine (fluids, controls, brakes, guards, lights, the lot) and mark each one OK, Defect or Not applicable. A defect needs a photo and a note. A stop-work defect means anyone who scans the sticker sees Do not use until you clear it.
- 04
You read the register.
Every day of checks on one page: who checked, what they found, the photos, what is still open. Print it, keep it, or carry the whole record into PlanOps with one click.
The bigger job
The daily check is
the start of the record.
PUWER wants the daily check; LOLER wants the thorough examination; the hire contract wants the off-hire condition. Here is what this free register does and what the full register in PlanOps adds.
On this page
- Single items of plant, with daily checks for a set number of days
- The real daily pre-use checklist for its category
- Defects with severity, description and a photo
- A stop-work hold the supervisor clears with a note
- A register you can read, print and carry across
In PlanOps
- The whole fleet: owned, hired and subcontractors’ plant on one register
- LOLER thorough examinations and PUWER inspections tracked to their due dates, certificates attached
- Defects raised to the hire company and chased to closure
- Operator competence, hire periods and off-hire checks alongside the daily record
- a lasting audit trail, in the project with everything else
Beyond one machine
Your plant already
has a home in PlanOps.
The register you build here carries across with one click: the machine, its checklist, every check, defect and photo. Add the rest of the fleet and the statutory dates, and the audit trail is maintained.
Data handling
What happens to your paperwork and the checks.
What we keep, what we delete and when.
- Your paperwork is not kept
- The hire note or certificate you drop in is read once to fill the form and then discarded. Only the details you confirm, and a note of which documents were seen, are kept.
- The register expires
- Daily checks run for a set number of days, and the register remains available for a while after that. When the register expires, the checks, the defect photos and the sticker are deleted together, automatically. Sign up at PlanOps for a full register that keeps the records for as long as you need.
- Operatives give a name, nothing else
- Whoever scans the sticker types their name once and it stays on their phone. No account, no phone number, no PIN. The name is recorded against each check they submit.
- Two private links
- The register link is yours and shows everything; the sticker link is on the machine and shows only what an operative needs. Anyone with the register link can read the register, so treat it as private.
- No account, no sales call
- You do not need an account to use this free plant register. An email address is optional: give one and we will send the register link and tell you about defects; leave it out and your plant register link is available in your browser.
A few useful details.
What counts as a daily check?
The pre-use check an operative does before starting work: a walk-round and function check against a list for that type of machine. PUWER itself doesn’t say daily, but HSE’s construction guidance recommends daily checks for plant such as dumpers and MEWPs, and most sites ask for one. The checklists here are the same ones PlanOps issues, written for excavators, telehandlers, cranes, dumpers, dump trucks, rollers and mast climbers, with a general check for everything else. Each one is also a free printable sheet.
What paperwork can I drop in?
The hire note or delivery note, a LOLER thorough examination report, a PUWER inspection record or a service record, as a PDF, PNG or JPEG - a photo of the page is fine. Up to three files for one machine. We use it to fill the form; nothing you upload is kept.
Does the operative need an account or an app?
No. They scan the sticker with the phone camera, type their name the first time and the checklist opens. The name stays on their phone, so the next scan goes straight to the check. One check a day is recorded per machine.
What happens with a defect?
The operative marks the item Defect, says how bad it is, describes it and takes a photo. Minor and major defects go on the register and, if you gave an email, you are told. A stop-work defect also means anyone who scans the sticker sees Do not use until you clear it on the register with a note, and that clearance stays on the record.
Does it track LOLER and PUWER dates?
Not on this free register. We note which certificates were in the paperwork, but only the daily checks are recorded. The statutory thorough examinations and periodic inspections, with their due dates and certificates, are tracked in PlanOps.
What happens when the daily checks stop?
The register remains available for a further period so you can print or save the record, or keep the plant in PlanOps with its full history of checks, defects and photos carried across. After that the checks, photos and sticker are deleted together.