Skip to content
Plant RegisterA service from PlanOps

Sample

A sample plant register

What a week of daily checks looks like on the free register: one excavator, checked from a QR sticker each morning. The machine, the people and the defects are illustrative. The checks are the real excavator list.

EX-204

8 tonne tracked excavator

JCB 85Z-1 · Excavator · Example Plant Hire Ltd

Excavator daily check (tracked), 15 items. Daily checks from Monday 5 October to Sunday 11 October.

1 defect on the register

Saturday has been checked. The stop-work defect from Wednesday was cleared the same afternoon.

  • 5 of 7 checks done
  • 1 defect open
  • 1 day missed

Days

Day 1Mon 5 OctCheckedA. Patel
Day 2Tue 6 OctDefects (1)A. Patel
Day 3Wed 7 OctStop work (1)J. Morris
Day 4Thu 8 OctDefects (1)A. Patel
Day 5Fri 9 OctMissed
Day 6Sat 10 OctDefects (1)A. Patel
Day 7Sun 11 OctUpcoming

Checks

  1. Saturday 10 OctoberA. Patel, 07:501 defect · Safe to use
    • Track tension and condition · Minor
      Left track still slack. Fitter booked for Monday.
      Photo taken at the machine
  2. Thursday 8 OctoberA. Patel, 07:351 defect · Safe to use
    • Track tension and condition · Minor
      Left track still slack. The hire company is sending a fitter.
      Photo taken at the machine
  3. Wednesday 7 OctoberJ. Morris, 07:281 defect · Not safe to use
    • Hydraulic hoses — no leaks, no damage · Stop work
      Hose to the boom ram weeping oil at the crimp. Machine parked on the hardstanding and keys handed to the supervisor.
      Photo taken at the machine

    Stop-work cleared by R. Okafor at 14:10: Hose replaced by the hire company’s fitter. Run up and checked under load, no leak.

  4. Tuesday 6 OctoberA. Patel, 07:411 defect · Safe to use
    • Track tension and condition · Minor
      Left track slack. Reported to the hire company for tensioning.
      Photo taken at the machine
  5. Monday 5 OctoberA. Patel, 07:32No defects · Safe to use

The register keeps who checked, when, what they found and the photos, and a stop-work defect holds the machine until someone clears it with a note of what was done. The paper version of the same check is the excavator pre-use check sheet.